inkl. MwSt.
Kostenloser Versand in DE!
Bestellen SIe jetzt und erhalten Sie ihre Ware innerhalb von wenigen Tagen kostenlos!
Please note that the values given are only approximate values, they can vary depending on the surface. Determine the exact consumption on the object.
Processing time:
Prepared floor leveling compound: within min. 30 min.
Leveled: within min. 20 min.
Our customer service is available from Monday to Friday from 9:00 AM to 6:00 PM.
Average response time: 24 hours
Optimal Processing Conditions
Which tool is the right one?
How do you clean tools?
It depends on the materials you have worked with:
Cleaning tools contaminated with epoxy resins is a bit more complicated. You should always weigh up cost vs. benefit:
Why is the paint or oil not drying?
Possible reasons:
The surface is still sticky after a few days of drying. What can I do?
Possible reasons:
If the paint was applied thickly or the excess oil was not removed from the surface, the wood may remain sticky.
What to do:
You can use a soda lye with warm water or sand the surface mechanically and then reapply the paint or oil.